Welcome to the 2005 GCISD Bond Program Website


Here you will find information and updates regarding the $107.9 million bond measure that
GCISD voters passed by 2:1 on September 10, 2005.

 

With the first group of renovation and construction projects set to begin next summer
(2006), we have selected a general contractor and are currently in the planning and
scheduling phase. 
 

The bond program will address five areas within the District:



    • Safety/security;


    • Renovation/repair of existing facilities;


    • Student and/or program growth;


    • Learning environment/instruction; and


    • Use of technology, operations and

      co-curricular/extracurricular
      programs.

A complete list of projects is available on this website, with specifics about each one, as
well as information about the program as a whole. As the bond program progresses,
additional details, meeting minutes, financial updates, photos and news will be added
to this website. So be sure and check back with us regularly for updates. Thank you
for visiting us online, and thank you for your interest in GCISD.

 

Sincerely,

Dr. Kay Waggoner

Superintendent

06/16/08

 

An update on activities related to the 2005 Bond Program was presented during the GCISD Board of Trustees meeting on June 16, 2008.  Progress reported included:

  • On Bid Package 5, work continues at the Professional Development and Education Center (former CES). Installation of ceiling tiles, carpet and other floor coverings is progressing and interior painting continues throughout the building. The cafeteria floor is being repaired in preparation for tile installation, and existing millwork is being removed for new cabinet installation. Phase II of construction at Colleyville Heritage and Grapevine high schools has begun. At CHHS, carpet, vinyl wall covering and acoustical ceilings are being removed; removal and replacement of roofing is progressing and HVAC installation has begun. At GHS, carpet is being removed; existing millwork is being removed and replaced; and exterior painting is progressing.

  • On Bid Package 6, renovations to Cannon, Dove, Grapevine and Heritage elementary schools, and Grapevine Middle School, began June 11. Work includes removal and replacement of carpet/floor coverings, wall coverings, roofing, HVAC equipment and electrical systems. Interior and exterior painting is progressing. At the Swim Center, installation continues on ceramic tile in the restroom and locker room areas, HVAC equipment and a fire sprinkler system in the pool area. Interior painting and re-roofing also is progressing.

 